Project Size (Rentable) Bldg A - 45,894
Bldg B - 53,744
Bldg C - 58,246
               157,884
Stories Two (2) stories per building
Divisibility 2-3 Tenants per building (Corp HQ/R&D)
Building Use Corporate HQ/Office/R&D
Interior Improvements Lobby restroom cores will be completed.  Showers and changing areas/locker rooms to be completed by Tenant under TI.  Main HVAC loop installed as well as 1 elevator and card reader access system per building.
Lobby Lobby consisting of stone tile flooring, accented with extensive use of woodwork and brushed aluminum.  12' high coiferred ceilings. Restroom cores, elevator and elevator interior cabs will be completed.
“Green” Building  Project will hold the “LEED for Core & Shell” designation. Visit the U.S. Green Building Council’s website (http://www.usgbc.org/) for more information on LEED certification in general, as well as the LEED for Core & Shell designation.
Site Area 11.35 gross acres
Zoning IP-2-1
Building Type Type V-N.  Reinforced concrete tilt-up panels
Elevator One (1) 2,500-pound capacity hydraulic elevator per building
Floor Loads Ground Floor  - 3,000 psi slab on grade                 
2nd Floor - 3500 psi for 3" concrete fill over steel pan deck (80 psf live load, 20 psf partition load)
HVAC System/Mechanical One (1) cooling tower per bldg
Parking Ratio 3.9:1,000 rsf (612 spaces, all surface)
Power Capacity 2,000 amps at 277/480 volts, 3 phase per building, expandable to 3,000 amps
Building Dimensions Bldg A - 118' 8" x 196' 8"
Bldg B - 118' 8" x 228' 8"
Bldg C - 118' 8" x 248' 8"
Building Height 34'
Floor-to-Floor Height 14' 3"
Finished Ceiling Height 10'
Column spacing 30' x 30' Typical
Mullion Spacing 5' 
Fire Sprinklers TBD
Shipping and Receiving One (1) Grade level door (plus one knockout panel) per building
Fiber Accessible through Time Warner and AT&T.  Must be pulled from further west onMeanly Drive.  Distribution conduits to be provided from MPOE room to edge of Meanly Drive
Views Panoramic westerly views + extensive eucalytpus stands on north and east sides of campus site.  Views of Evan's pond as well.
Security Located on cul-de-sac w/ ability to secure and gate entrance to project
Estimated Completion Jun-08